Skip to content
Planned Shutdown Lighting Tower Hire

PLANNED SHUTDOWN
LIGHTING TOWER HIRE — QLD

When your site runs night-shift work during a shutdown window, you need wide-area illumination you can rely on. HPA delivers LED, solar, and hybrid lighting towers for planned mine shutdowns across Queensland — pre-positioned, fully fuelled, and supported 24/7 for the duration of the job.

Shutdown Specialists

POWER THAT ARRIVES ON TIME

Planned shutdowns run to tight schedules — every hour of delay costs money. HPA's shutdown power packages are pre-engineered and ready to mobilise at short notice. We've delivered temporary power for everything from routine annual shutdowns to major capital works turnarounds on Bowen Basin mine sites.

Our project managers work with your shutdown coordinator in advance to confirm load requirements, access, connection points, and fuel logistics — so when your shutdown day arrives, the power is ready before your crews are.

48hr Mobilisation

Rapid deployment capability across QLD

Full Load Testing

Power verified before your crews start

24/7 On-Site Support

Technician on call for the shutdown duration

Fuel Management

Coordinated re-fuelling so you never run dry

Plan Your Shutdown Power

Shutdown Package Includes

  • Pre-shutdown load assessment and power plan
  • Generator delivery, connection, and commissioning
  • Load bank testing before live connection
  • On-call technician for shutdown duration
  • Demobilisation and site clearance
Shutdown Scenarios

WE'VE COVERED THEM ALL

Whether it's a 3-day routine maintenance window or a 6-week major overhaul, HPA has the fleet and the people to keep your shutdown powered throughout.

ROUTINE MAINTENANCE

Annual or bi-annual planned outages — typically 3–10 days. Fast-deploy generator packages sized for maintenance crew and lighting loads.

MAJOR TURNAROUNDS

Large-scale plant overhauls from 2–8 weeks. Multi-generator packages with paralleling panels, distribution boards, and 24/7 supervision.

EMERGENCY BACKUP

Unplanned outages require immediate response. HPA maintains standby fleet available for emergency mobilisation within 24–48 hours.

Why Choose HPA

BUILT FOR QUEENSLAND MINING

24/7 SUPPORT

Round-the-clock technical support and field service response across Queensland mine sites.

UP TO 50% FUEL SAVINGS

Proven hybrid and renewable systems that dramatically cut diesel consumption and operating costs.

QLD-WIDE DELIVERY

Fleet delivered and commissioned across the Bowen Basin, North Queensland, and remote regions.

ZERO DOWNTIME FOCUS

Redundant power design and proactive maintenance to keep your site running without interruption.

Common Questions

FREQUENTLY ASKED

For planned shutdowns, we recommend contacting HPA at least 2 weeks in advance to confirm fleet availability and complete load planning. For urgent requests, we maintain standby equipment and can often mobilise within 24–48 hours.

Yes. HPA has extensive experience with multi-generator paralleling for major shutdown and turnaround projects. We supply synchronising panels, distribution boards, and all associated cabling as part of the package.

Yes. HPA coordinates refuelling schedules to ensure continuous operation for the duration of your shutdown — you won't need to manage fuel logistics separately.

HPA services the entire Queensland resources sector including the Bowen Basin, Surat Basin, North West Minerals Province (Mount Isa region), and coastal industrial areas. Call us to confirm coverage for your specific site.

READY TO CUT FUEL COSTS?

Talk to our team about the right solution for your mine site. We'll assess your load profile, run the numbers, and deliver a solution that saves you money from day one.