PLANNED SHUTDOWN
GENERATOR HIRE — QLD
When your site goes offline for maintenance, Hybrid Power Australia keeps the power on. We supply, deliver, and commission temporary diesel and hybrid generator packages for planned shutdowns across Queensland — fast mobilisation, zero production delay, 24/7 on-site support for the duration.
POWER THAT ARRIVES ON TIME
Planned shutdowns run to tight schedules — every hour of delay costs money. HPA's shutdown power packages are pre-engineered and ready to mobilise at short notice. We've delivered temporary power for everything from routine annual shutdowns to major capital works turnarounds on Bowen Basin mine sites.
Our project managers work with your shutdown coordinator in advance to confirm load requirements, access, connection points, and fuel logistics — so when your shutdown day arrives, the power is ready before your crews are.
48hr Mobilisation
Rapid deployment capability across QLD
Full Load Testing
Power verified before your crews start
24/7 On-Site Support
Technician on call for the shutdown duration
Fuel Management
Coordinated re-fuelling so you never run dry
Shutdown Package Includes
- Pre-shutdown load assessment and power plan
- Generator delivery, connection, and commissioning
- Load bank testing before live connection
- On-call technician for shutdown duration
- Demobilisation and site clearance
WE'VE COVERED THEM ALL
Whether it's a 3-day routine maintenance window or a 6-week major overhaul, HPA has the fleet and the people to keep your shutdown powered throughout.
ROUTINE MAINTENANCE
Annual or bi-annual planned outages — typically 3–10 days. Fast-deploy generator packages sized for maintenance crew and lighting loads.
MAJOR TURNAROUNDS
Large-scale plant overhauls from 2–8 weeks. Multi-generator packages with paralleling panels, distribution boards, and 24/7 supervision.
EMERGENCY BACKUP
Unplanned outages require immediate response. HPA maintains standby fleet available for emergency mobilisation within 24–48 hours.
BUILT FOR QUEENSLAND MINING
24/7 SUPPORT
Round-the-clock technical support and field service response across Queensland mine sites.
UP TO 50% FUEL SAVINGS
Proven hybrid and renewable systems that dramatically cut diesel consumption and operating costs.
QLD-WIDE DELIVERY
Fleet delivered and commissioned across the Bowen Basin, North Queensland, and remote regions.
ZERO DOWNTIME FOCUS
Redundant power design and proactive maintenance to keep your site running without interruption.
FREQUENTLY ASKED
For planned shutdowns, we recommend contacting HPA at least 2 weeks in advance to confirm fleet availability and complete load planning. For urgent requests, we maintain standby equipment and can often mobilise within 24–48 hours.
Yes. HPA has extensive experience with multi-generator paralleling for major shutdown and turnaround projects. We supply synchronising panels, distribution boards, and all associated cabling as part of the package.
Yes. HPA coordinates refuelling schedules to ensure continuous operation for the duration of your shutdown — you won't need to manage fuel logistics separately.
HPA services the entire Queensland resources sector including the Bowen Basin, Surat Basin, North West Minerals Province (Mount Isa region), and coastal industrial areas. Call us to confirm coverage for your specific site.
READY TO CUT FUEL COSTS?
Talk to our team about the right solution for your mine site. We'll assess your load profile, run the numbers, and deliver a solution that saves you money from day one.